Factory Acceptance Test
During FAT (Factory Acceptance Test) the as-built plant and accessories correspondence with the contractually established requirements are carefully checked under the point of view of documents, dimensions, planting and processes.
Site Acceptance Test
The Site Acceptance test (SAT) activities are performed with the aim to verify the right installation and operational state of the plant by the final Customer’s. Those activities include document and operating tests.